Design-build addition to residence, Ithaca, NY

[Addition homepage]

Week 12: August 23 - August 29, 2004

[previous week] | [next week] | [week by week index]
construction
With the first layer of roof structure in place, it is finally possible to put our big silver tarp over the top of the addition. Susan uses saw horses to elevate the center of the tarp, thereby draining rain water off and over the sides.
construction
Susan terraces the edge of the driveway where the excavation occurred and plants buckwheat to stabilize the earth wall.
construction
We finish the final level of scaffolding, necessary to install the sheathing over the parapet wall and, eventually, the siding panels. A ladder allows access from the mezzanine "door."
construction
Rob uses his fish-eye lens to capture the spatial complexities of the studio (left) and the newly-constructed low roof over the three-foot zone between the existing house and the main volume of the addition (right).