Design-build addition to residence, Ithaca, NY
[Addition homepage]
Week 8: July 26 - August 1, 2004
[previous week] |
[next week] |
[week by week index]
Wall sections are assembled and nailed together on the plywood subfloor before being lifted into place.
After Susan and I lift the wall sections into place, we align them, and nail them into adjacent sections.
Views of future studio space; windows face north and east.
View from the ground, looking up.
Addition shown with existing house.