construction
Finally, we install the 2nd-floor 2x10 joists. This is the view from the existing 2nd-floor bathroom window.
construction
Some of the joists cantilever over the east wall; ultimately, this three-foot zone will contain a stair to the mezzanine (and from there to the roof deck).
construction
This is me applying construction adhesive to the joists before nailing down the plywood subfloor. Photo by Rob Ochshorn.
construction
With the subfloor in place, we build the first segment of the 2nd-floor wall, and fasten it to the existing house.
construction
Now, it's time to install the first really big wall segment. Susan, Rob, and I lift it halfway up, then pause to consider how heavy it really is. Time to call neighbors for some additional muscle. Fifteen minutes later, the segment is lifted into place.