Design-build addition to residence, Ithaca, NY
[Addition homepage]
Week 5: July 5 - July 11, 2004
[previous week] |
[next week] |
[week by week index]
I build the first wood-framed walls.
Meanwhile, Dale Everhart returns to dig up the old clay sewer pipe, after we discover that the entire section under the driveway has been crushed by all the heavy construction vehicles.
Brad from Hull Plumbing installs the new PVC pipe, and then displays his occupation-appropriate tattoo.
The first-floor wood-framed stud walls are pretty much complete.
With our new pneumatic framing nailer, we install the first plywood sheathing boards.
[previous week] | [next week] | [week by week index]
last updated: 11 July 2004